...

Go Back   Lateral-g Forums > Technical Discussions > Shop & Equipment
User Name
Password



Reply
 
Thread Tools Display Modes
  #121  
Old 04-11-2011, 05:11 PM
Garage Dog 65 Garage Dog 65 is offline
Senior Member
 
Join Date: Jun 2006
Location: Indianapolis IN
Posts: 1,207
Thanks: 0
Thanked 1 Time in 1 Post
Default Ready for Paint

Got a chance to start putting the welding table together… Finally.

All welded together – hangars located and temporary installed. I changed the design to make them removable and adjustable. They will be stainless and I’ll install them after paint. There will be a washers up against the leg – with a hole drilled thru the bar for a hairpin to keep it in place while being able to adjust it in the future for changes in tools. Left side is c-clamp storage. Right side is vice-grip storage. I added a tool rack on the right side to hold all the standard fab tools. Found a nice bolt on unit that holds everything in a compact format. (it’s located at www.swagoffroad.com). The cross support under the table is where I’ll store tools that will bolt to the table top when needed (vise, tube notcher, Beverly shear, etc) Added a 58 piece machinist clamp set so I can clamp directly to the hole pattern (3/8 x 16 NC) I punched into the table top. The draw glides are located and installed.











Next is to build the drawer and the removable splatter guard that bolts to the table top – and sand down the table top and sides so they are nice and shinny.

Off to the sand blaster this week and then to paint. I’ll update when it’s completed.

Jim
__________________
My Project: 65 Porsche 356G

https://lateral-g.net/forums/showthread.php4?t=5109
Reply With Quote
  #122  
Old 04-11-2011, 05:25 PM
GregWeld's Avatar
GregWeld GregWeld is offline
Lateral-g Supporting Member
 
Join Date: Jul 2005
Location: Scottsdale, AriDzona
Posts: 20,741
Thanks: 504
Thanked 1,080 Times in 388 Posts
Default

Looks great Jim --

JIMHO -- Make the splatter guard sit in slots so it's QUICKLY removable. Everything you do will have you bolting and unbolting the guard.

BTW.... Just poking you here 'cause your work on this project is killer nice.... what's with the masking tape holding the cover plates. Dude! You have enough clamps that you could have held 'em on there hot rod style!
Reply With Quote
  #123  
Old 04-11-2011, 05:35 PM
GregWeld's Avatar
GregWeld GregWeld is offline
Lateral-g Supporting Member
 
Join Date: Jul 2005
Location: Scottsdale, AriDzona
Posts: 20,741
Thanks: 504
Thanked 1,080 Times in 388 Posts
Default

PS -- I just ordered two of the "clutter catchers". I was planning to give you major crap for designing (I imagined hours of thinking and tweaking) and then having this piece laser cut.... but lucky for me I clicked the link and saw this killer piece first!

Thanks for finding it and posting it up!
Reply With Quote
  #124  
Old 04-11-2011, 05:43 PM
ccracin's Avatar
ccracin ccracin is offline
Senior Member
 
Join Date: Sep 2006
Location: Rostraver, PA
Posts: 2,077
Thanks: 0
Thanked 4 Times in 4 Posts
Default Junk!

You have been holding out on me! Glad to see you making some garage time. Looks great!
__________________
Chad
Instagram - @cctek
https://https://www.facebook.com/CCTek

68 Chevy Pickup Project
Build Thread: https://lateral-g.net/forums/showthread.php4?t=7505

THANKS TO: A&M Machine and Fabrication, CCTek (http://www.candctek.com), Hermance Design(www.hermancedesign.com), Paradise Road Rod & Custom, Harry Opfer Welding, Wegner Automotive Research, Clayton Machine Works
Reply With Quote
  #125  
Old 04-11-2011, 05:47 PM
GregWeld's Avatar
GregWeld GregWeld is offline
Lateral-g Supporting Member
 
Join Date: Jul 2005
Location: Scottsdale, AriDzona
Posts: 20,741
Thanks: 504
Thanked 1,080 Times in 388 Posts
Default

I use the Beverly shear all the time so mounted it on one leg.....




Reply With Quote
  #126  
Old 04-11-2011, 07:07 PM
65 347's Avatar
65 347 65 347 is offline
Senior Member
 
Join Date: Apr 2006
Location: South Side Chicago
Posts: 469
Thanks: 0
Thanked 15 Times in 9 Posts
Default

Just an idea, weld on a 2" id box tube under the table, then mount your vise or any other tool on a plate welded to a 2' od box tube. Works like a trailer hitch with a pin. Very strong and can be removed
Attached Images
  
Reply With Quote
  #127  
Old 04-11-2011, 08:15 PM
Fluid Power's Avatar
Fluid Power Fluid Power is offline
Senior Member
 
Join Date: Dec 2004
Location: Columbus, Ohio
Posts: 1,029
Thanks: 8
Thanked 5 Times in 2 Posts
Default

Good ideas guys!

Darren
Reply With Quote
  #128  
Old 06-24-2011, 02:02 AM
OneZero1's Avatar
OneZero1 OneZero1 is offline
Member
 
Join Date: Jan 2010
Location: Mililani, HI
Posts: 23
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Great thread!
__________________
Travis
Reply With Quote
  #129  
Old 06-24-2011, 10:31 AM
Gandalf Gandalf is offline
Senior Member
 
Join Date: Oct 2005
Posts: 372
Thanks: 1
Thanked 6 Times in 2 Posts
Default

Quote:
Originally Posted by 65 347 View Post
Just an idea, weld on a 2" id box tube under the table, then mount your vise or any other tool on a plate welded to a 2' od box tube. Works like a trailer hitch with a pin. Very strong and can be removed
I dig this idea BIG TIME! Thanks guys!

Nice work Jim! Very professional.
Reply With Quote
  #130  
Old 07-13-2011, 07:58 AM
chevyIIpost's Avatar
chevyIIpost chevyIIpost is offline
Senior Member
 
Join Date: Feb 2008
Location: Tulsa Oklahoma
Posts: 150
Thanks: 0
Thanked 0 Times in 0 Posts
Default

I made this one about a year ago primarily for welding and Fab work. It is also used by other co-workers at my work that are heavy fisted and not always 10% smarter than what they are working on so the frame may be a little over built. It is 2x4 x3/16. The top is just 1/2" plate that is 4'x8'. I like an overhang on my tables for clamping and set up. But that can be a fine line between strength or stiffness and ease of use. If your not conscientious about the over hang it can get tweaked. It also has drilled holes in the top that are threaded for attachment points and lifting eyes. We have a Gaffey gantry crane to move the 1000lb table with. I built the base to keep the legs out of my way and give max clearance. The center cross member at the floor is actually raised to make clean up easier so it doesn't trap debris. The leg configuration has also helped when the floor is less than flat or even. It has a 1/2 inch bolt threaded in at all 4 corner legs to attach you ground clamp to and cross bars at each end to hang clamps on that keep the working area more free of tools.
Attached Images
    
__________________
Ted Rea
"Don't drive FASTER than your guardian angel can fly"

Last edited by chevyIIpost; 07-13-2011 at 10:17 AM.
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 11:59 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net