...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #28  
Old 07-11-2012, 11:28 PM
CamaroAJ's Avatar
CamaroAJ CamaroAJ is offline
Lateral-g Supporting Member
 
Join Date: Mar 2010
Location: San Antonio, Tx
Posts: 883
Thanks: 104
Thanked 325 Times in 139 Posts
Default

while it doesn't appear that there is a lot done (at least to me anyways) i have been doing a lot on the car that i am just not going to show until the car is done as some of it might make it into a production run.

machined some bulkheads for the passenger side brake line and the driver side brake, fuel and return lines.




then finished the fuel lines back to the fuel cooler and trunk bulk heads and the brake lines.





the rear sections of fuel lines are covered in heat tape then cloth heat shrink.




then i started mounting the diff. cooler. there will also be a trans cooler on the other side in the same place.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 11:57 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net