...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Open Discussion
User Name
Password



Reply
 
Thread Tools Display Modes
  #1  
Old 08-04-2013, 08:53 PM
Sieg's Avatar
Sieg Sieg is offline
Moderator
 
Join Date: Dec 2010
Location: Pacific Northwet
Posts: 8,034
Thanks: 33
Thanked 101 Times in 41 Posts
Default

Lenie - I totally understand where you're coming from. It doesn't seem to matter if it's cars, plumbing, electrical, sprinklers, HVAC, janitorial, landscaping, fencing, etc. I think part of the issue may be that time is so fragmented/interrupted with recreational electronics and social networking by those doing specialty work that they can't drill-down and focus on a task for 8 hours a day four or five days a week like in decades past.

I've been running into issues with less than desirable repair work that was done on my Camaro, truck, and wife's vehicle.........all by longtime high quality reputation companies in the town I've lived my entire life.

It's not just effecting the blue-collar worker, the managers and owners are guilty too.

That slice of 24 hours we refer to as a day is getting sliced into way too many pieces.

Sadly, I've gotten to the point that I just plan on thoroughly inspecting everything I have worked on to insure it's correct. Usually I can do the necessary work myself easier/quicker than I can reschedule the call-back work. I do make an effort to advise the company of the issues so they can address them internally.
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 12:01 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net