...

Go Back   Lateral-g Forums > Technical Discussions > Man Caves
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 01-06-2014, 09:14 AM
SSLance's Avatar
SSLance SSLance is offline
Senior Member
 
Join Date: Oct 2013
Location: Peoria, AZ
Posts: 2,683
Thanks: 72
Thanked 338 Times in 212 Posts
Default

Quote:
Originally Posted by jlwdvm View Post
Sounds like you know a little bit more about the composition of your slab....which helps.
Yeah, I built it...so I saw what was under it before it was poured and I knew what was poured..

You drilled sideways into the existing slab that was left and tied the new rebar into the old slab...right?

You'll be fine and I understand being concerned about the unknown in your case.

My main concern was actually hitting rebar while drilling the holes...which did happen in two cases. Cost me a $60 rebar drilling concrete bit to get those two holes drilled finally. Neither one was a direct hit though, both were about a half hit on the rebar.
__________________
Lance
1985 Monte Carlo SS Street Car
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 01:06 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net