...

Go Back   Lateral-g Forums > Technical Discussions > Man Caves
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 04-22-2014, 08:28 PM
GregWeld's Avatar
GregWeld GregWeld is offline
Lateral-g Supporting Member
 
Join Date: Jul 2005
Location: Scottsdale, AriDzona
Posts: 20,741
Thanks: 504
Thanked 1,080 Times in 388 Posts
Default Weld's new "Shed"

Okay -- since the original post was lost in the server swap.... I'll repost this so that you guys will have reference for "before" and "after".... so here goes.


The new shop building... which was bank owned. The shop has TWO 16' high doors that are both 14' wide. Perfect for using the far right door/bay for the semi rig parking.









The main floor is 5250 square feet... so that ought to work our just fine! But it's dirty -- and lots of stuff on the walls that will be cleaned up -- and power that I can't use (480Volt 3 phase!)... So the electricians were in first - cleaning up and making safe.





















This area under the upstairs will be my new "tool area".... it has heated floors!! Sweet!! It's 14' wide and 43' long -- so plenty of room for my stuff.













This building was last used to refinish doors -- so they had big sanders and a spray refinishing area ---- EVERYWHERE was sawdust and lacquer residue... so it took a bit to clean that up. They power washed EVERY SQUARE INCH -- including the ceiling and all the truss system - and then they washed the floor 4 times!












AND then this was the upstairs "office" --- what a nasty dark horrible dump that had to be to work in!! OMG just awful!





Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 07:07 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net