Here are some detail shots of the engine. You can see the DBW throttle body will be mounted on the firewall for packaging issues. We also made the Vortech Super Charger brackets. You will see them in .125 steel and then in 1/2 plate once the design was completed. The boot on the super charger was source from a big rig truck. Lots of cool details going into this. We still have to get the power steering pump bracket to fit into the opening behind the blower belt and the rack and pinion.