Next up I got the firewall/floor pan supports fitted up and welded in. These fit pretty good as well and I used the subframe to make sure everything was in the right spot. So glad to have that part done! I also managed to get my hand with a 60 grit flapper disc, right thru the glove! Word to the wise, wear leather gloves for that stuff.
Also, just some random pics. Next is to get the thing off the metal frame and onto some jack stands or casters of some type. Still have some welding to do and plenty of welds to dress. After that, i need to get the torque boxes and subframe connectors welded in and get the extra holes in the firewall and core support filled.
|