Did some more disassembly this morning........ Got all the wires that will be replaced with the rewire out...... Removed the make shift trans tunnel . There are some rust holes thru the front floor pans so we will be replacing them along with fixing the trans tunnel.....Lot's of parts showing up next week
Got the steering column in and got the connection to the box finished Going to put a Patch panel on the Passenger side Floor pan ..... I'll be welding that in today after treating the floor with some Rust remover to get rid of the surface Rust, then treating the floor with Boeshield to help prevent further surface rust... Engine will be here tomorrow and then the real assy will begin
Got the Floor patch panel welded in today and got the drivetrain delivered to the house... I thought I was going to be able to save Jeff and Judy some $$ by being able to use the as delivered oil pan.. Wrong... . Luckily I have a new 302-2 Holley pan in the garage... .. It will have a new home shortly... .