...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 06-06-2023, 08:31 PM
syborg tt's Avatar
syborg tt syborg tt is offline
Lateral-g Supporting Member
 
Join Date: Jun 2005
Posts: 8,432
Thanks: 5,585
Thanked 2,016 Times in 1,085 Posts
Default Tiger Cage Main Hoop Hardware (( 05-20-23 ))

Okay, So I assure you I said a slew of choice words installing the final hardware for the Tiger Cage main hope. It's not the fault of
the bar it's the kick panels are so close to two of the bolts that you basically have to tighten the bolts a 1/4 turn at a time.



I had to break out the dreaded Anti-Seize !!!!







I laid in the wire gutters and they need some serious cleaning, prep and paint.



Ugh this sucks !!!











I coated them with the Eastwood rust convertor paint and hoped for no rain.

__________________
marty-mj
Is a car ever really done???? It's like a ball of yarn unwinding, that has no end... Author DKz Garage

Projects - Syborg TT 4.3l v6 Mini-Truck, 2nd Chance Camaro & SLP575 Bumble Bee - 4Sale
Reply With Quote
The Following User Says Thank You to syborg tt For This Useful Post:
fleetus macmullitz (06-07-2023)
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 03:08 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net