...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 07-08-2024, 04:32 AM
Sheck44's Avatar
Sheck44 Sheck44 is offline
Senior Member
 
Join Date: Mar 2013
Location: Pickering Ont
Posts: 1,089
Thanks: 211
Thanked 1,131 Times in 404 Posts
Default

Morning all ...

Spent about 4 hours cleaning up all the edges, and some of the welds to ensure a great powder coating job

IMG_3469 by Steve Heck, on Flickr

IMG_3466 by Steve Heck, on Flickr


Off to powder coating


IMG_3471 by Steve Heck, on Flickr
__________________
'Build it RIGHT the 2nd time'
69' SS X11 PRO-TOURING - SOLD
73' FJ40 LS - SOLD
1966 FJ40 R2.8 -SOLD
911 Hotrod - SOLD
2002 Gated 360
Next up - "Killer Piggy"
67' Camaro - Take-Over'
Reply With Quote
The Following 5 Users Say Thank You to Sheck44 For This Useful Post:
214Chevy (07-09-2024), camcojb (07-08-2024), fleetus macmullitz (07-08-2024), Roscoe03 (03-08-2025), syborg tt (07-15-2024)
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 07:54 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net