I was able to spend some time in the garage yesterday:
I finished fabricating the transmission tunnel and got it welded in. I made the panel on top removable, so if I needed to, I can remove the panel and get to the four bolts holding the shifter to the transmission.
A little grinding, seam sealer and paint and the floors will be ready for sound deadening.
Next up harness bar install and then seat mounts...