We we have her on her side to finish welding up som epiece on the bottom and getting her ready for Powder coating. The frame rails look awesome from underneath. We are setting the steering column drop today and seating up the seat tabs for the Corbeau seats. We will start the mods to the dash to install the Autometer gauges. The Exhaust is at Specialized coatings in Huntington beach, we are doing that in a titianium color.
Enjoy the pics
Oh and I alomost forgot the 18x12 and 17x8.5 Fikses arrived last week, They should look great with the BFG tires.
Once again I have give credit to the customer and to the guys I have working in the shop. We started on this right before Christmas and It is supposed to go to Powder coat next week. It should be burning up the ashpalt real soon.