...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 03-25-2007, 10:23 PM
two68s's Avatar
two68s two68s is offline
Member
 
Join Date: Nov 2006
Location: Robertsdale, AL
Posts: 77
Thanks: 0
Thanked 0 Times in 0 Posts
Default Teardown progress on the Mustang

I was able to make some progress on my fastback recently. I'm still doing some exploratory surgery, but so far so good. So far, the only major rust is under what used to be the battery tray. Most of the problem spots for mustangs are in great shape:





The cowl side panels look great, I'm still gonna cut the top panel off just to check down inside:






I still have to disassemble the doors, remove the wiring harness, fuel/brake lines, and a few misc. parts then she'll be ready for media blasting.
__________________
-Jeremy

1968 Mustang Coupe: warmed up 289, C4
1968 Mustang Fastback: current project
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 01:41 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net