...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #25  
Old 04-07-2006, 12:55 PM
Steve1968LS2's Avatar
Steve1968LS2 Steve1968LS2 is offline
Moderator
 
Join Date: Feb 2005
Location: Anaheim Hills, CA
Posts: 5,534
Thanks: 0
Thanked 4 Times in 2 Posts
Default

Well the project should be moving FAST now since we have programing lined up for the LS2. The dyno stuff should happen in the next 1.5 weeks.

The new firewall has been bonded on and will be welded on Monday. The new trans tunnel has been welded in place along with the transition.

All holes have been cut in the firewall (brake master, steering column, clutch master). The ATS bracket made installing the clutch master a breeze!

In less than two weeks the whole deal will be painted and the undercoating done.

The subframe from 21st Century is at the shop now and I will start bolting on parts next week. I need to figure out a way to weigh it.

Rick's Hot Rods is finishing up my new tank and all the other parts are in my garage except the new guages. There might be light at the end of the tunnel..
Attached Images
  
__________________
"A ship in port is safe, but that's not what ships are built for."

See Bad Penny run the cones: https://www.youtube.com/watch?v=8GUPPIX-92U

1971 Chevelle Wagon - Roadster Shop Chassis ProCharged Shafiroff LS and lots of yada yada

1968 Camaro - Project Track Rat - 440 RHS LS
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 11:22 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net