...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Open Discussion
User Name
Password



Closed Thread
 
Thread Tools Display Modes
  #1  
Old 03-27-2011, 07:44 AM
Ketzer's Avatar
Ketzer Ketzer is offline
Lateral-g Supporting Member
 
Join Date: Feb 2008
Location: Eads, TN.
Posts: 1,462
Thanks: 376
Thanked 177 Times in 117 Posts
Default

This sucks for MM. I understand how you are in this spot. I'm waiting on some one-off wheels that were supposed to be 60-70 days out, that was in early Dec.

I don't guess I'm familiar enough with the selling practices of some of these parts businesses. You guys talk about paying percentages for parts and paying the balance after you receive them? I wouldn't ship a toilet seat unless it was paid in full on the front end. I'm suprised that you are saying some will do that? We aren't talking about building a car where you do some work, get paid a little, do some more work, etc. Who could send parts out on a percentage and hope to get the rest? I don't get where you are saying MM shouldn't have paid in full up front? That isn't really an option, is it?

Jeff-
__________________
You remind me of the timing on a turbo engine...
  #2  
Old 03-27-2011, 08:26 AM
XcYZ's Avatar
XcYZ XcYZ is offline
Administrator
 
Join Date: Jun 2004
Location: Rochester, Minnesota
Posts: 8,998
Thanks: 0
Thanked 0 Times in 0 Posts
Default

This seems to be a trend.

I would be pissed. I fully understand asking for a % down on a large order, but asking to be paid in full and not getting parts for 6 months is ridiculous. And they don't even know what parts you have or haven't recieved?

Who is this vendor? I think that company needs to explain what's going on and bring this to resolution.
__________________
Scott

My LS7 69 Camaro
  #3  
Old 03-27-2011, 08:37 AM
scherp69's Avatar
scherp69 scherp69 is offline
Lateral-g Supporting Member
 
Join Date: Dec 2007
Location: British Columbia, Canada
Posts: 882
Thanks: 0
Thanked 4 Times in 2 Posts
Default

Quote:
Originally Posted by ModernMuseum View Post

And yeah, OOCustoms, I don't like to be a whistle blower, but you can ctrl-f here and there and find out who it is pretty easily. You may be surprised, but then again you may not.
Quote:
Originally Posted by XcYZ View Post
This seems to be a trend.

I would be pissed. I fully understand asking for a % down on a large order, but asking to be paid in full and not getting parts for 6 months is ridiculous. And they don't even know what parts you have or haven't recieved?

Who is this vendor? I think that company needs to explain what's going on and bring this to resolution.
I think he told us who the vendor is, if I'm reading between the lines correctly.
__________________
Mike

Pro Touring 68 Acadian(Nova)
Speedtech subframe with high clearance control arms
Prodigy Bar rear suspension
Ridetech single adjustable coilovers
Wilwood 12.2" brakes
New Gen Splitters
LS3 and TKO600

Link to my build: https://lateral-g.net/forums/showthread.php4?t=14349


Last edited by scherp69; 03-27-2011 at 08:41 AM.
  #4  
Old 03-27-2011, 08:58 AM
PSV's Avatar
PSV PSV is offline
Senior Member
 
Join Date: May 2005
Posts: 180
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Why is the vendor not being outed? There are similar threads going on in both forums over the last several months and the stories are very similar and likely are the same vendor. Why not prevent someone else from having to experience the same frustration?
  #5  
Old 03-27-2011, 09:12 AM
XcYZ's Avatar
XcYZ XcYZ is offline
Administrator
 
Join Date: Jun 2004
Location: Rochester, Minnesota
Posts: 8,998
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Quote:
Originally Posted by PSV View Post
Why is the vendor not being outed? There are similar threads going on in both forums over the last several months and the stories are very similar and likely are the same vendor. Why not prevent someone else from having to experience the same frustration?
I don't know who the vendor is, but I suspect the OP (MM) is hesitant because the vendor has him over a barrell as they have his money and the control of his parts.
__________________
Scott

My LS7 69 Camaro
  #6  
Old 03-27-2011, 09:28 AM
BBC69Camaro's Avatar
BBC69Camaro BBC69Camaro is offline
Senior Member
 
Join Date: Dec 2007
Location: Los Angeles, CA
Posts: 572
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Unless I was told something was on back-order, I doubt I would be nice after 3 months for something that I paid for.

At this point I wouldn't be nice anymore. I would email the vendor a link to this thread and tell him you either want a refund of un-shipped parts or a tracking number with a packing list indicating what was shipped or you will post their business name on this board along with every board that will let you that they do business on.

I'd also look into what charges could still be disputed with my CC company as a backup plan.
  #7  
Old 03-27-2011, 09:40 AM
ModernMuseum ModernMuseum is offline
Senior Member
 
Join Date: May 2010
Posts: 139
Thanks: 0
Thanked 1 Time in 1 Post
Default

Quote:
Originally Posted by BBC69Camaro View Post
Unless I was told something was on back-order, I doubt I would be nice after 3 months for something that I paid for.

At this point I wouldn't be nice anymore. I would email the vendor a link to this thread and tell him you either want a refund of un-shipped parts or a tracking number with a packing list indicating what was shipped or you will post their business name on this board along with every board that will let you that they do business on.

I'd also look into what charges could still be disputed with my CC company as a backup plan.
I'm sure he'll find it on Monday
  #8  
Old 03-27-2011, 08:41 AM
Ron in SoCal's Avatar
Ron in SoCal Ron in SoCal is offline
Senior Member
 
Join Date: Dec 2009
Posts: 5,044
Thanks: 6
Thanked 9 Times in 6 Posts
Default

Quote:
Originally Posted by XcYZ View Post
This seems to be a trend.

I would be pissed. I fully understand asking for a % down on a large order, but asking to be paid in full and not getting parts for 6 months is ridiculous. And they don't even know what parts you have or haven't recieved?

Who is this vendor? I think that company needs to explain what's going on and bring this to resolution.
Bravo Scott!
__________________
Ron in SoCal
69 Camaro in progress
https://lateral-g.net/forums/showthread.php4?t=31246

  #9  
Old 03-27-2011, 09:00 AM
ModernMuseum ModernMuseum is offline
Senior Member
 
Join Date: May 2010
Posts: 139
Thanks: 0
Thanked 1 Time in 1 Post
Default

Quote:
Originally Posted by XcYZ View Post
This seems to be a trend.

I would be pissed. I fully understand asking for a % down on a large order, but asking to be paid in full and not getting parts for 6 months is ridiculous. And they don't even know what parts you have or haven't recieved?

Who is this vendor? I think that company needs to explain what's going on and bring this to resolution.
IIRC, the terms were loose and simply vocal with regards to to the payment plan. I would have paid in full during the initial payment, but I had to shift some funds around and sell some stocks, which is why the payments were separated by a month. My initial thinking was, that I was dealing with a really solid vendor and the payment plan was ancillary to getting the parts. The Vendor didn't demand payment in full, but wanting the parts as soon as possible, I opted to pay up front.

I think I'm in the right that 6 months is a little out of control. (Actually, I think it's completely out of control.) I just wanted to check and see with you guys that my expectations were on par with yours. Looking back at my build thread (@PSV), the work came to a pretty good halt in December.
  #10  
Old 03-27-2011, 09:09 AM
XcYZ's Avatar
XcYZ XcYZ is offline
Administrator
 
Join Date: Jun 2004
Location: Rochester, Minnesota
Posts: 8,998
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Quote:
Originally Posted by ModernMuseum View Post
I think I'm in the right that 6 months is a little out of control. (Actually, I think it's completely out of control.) I just wanted to check and see with you guys that my expectations were on par with yours. Looking back at my build thread (@PSV), the work came to a pretty good halt in December.
I agree, completely out of control.
__________________
Scott

My LS7 69 Camaro
Closed Thread

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 11:33 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net