...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #12  
Old 10-27-2007, 12:22 PM
James OLC's Avatar
James OLC James OLC is offline
Senior Member
 
Join Date: Jan 2006
Location: Calgary, AB
Posts: 1,459
Thanks: 0
Thanked 1 Time in 1 Post
Default

Quote:
Originally Posted by awr68
Looks good! What else needs done before the teardown for body/paint?
Where to start...
  • Mount shocks and remote reservoirs with plumbing
  • Plumb diff cooler with remote pump
  • Fit axles and brakes, plumb brake lines
  • Mock up Toyo R888's, trim quarter as needed and order wheels
  • Run sensors for traction control
  • Plumb fuel and return lines
  • Run battery cable to starter
  • Finish running lines for A/C
  • Cut tunnel for shifter
  • Final fit for oil cooler, trans cooler, and ps cooler
  • and a couple of bits and pieces here and there before blowing it apart
we're hoping to have the underside done and in paint with the interior and roll cage first week in December.

Thanks for reminding me of the list, it's been like twelve hours since I last stressed about it - lol.
__________________
James
1967 Camaro RS - The OLC
1967 Camaro RS - Recycler
1969 Camaro - Dusty
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 08:04 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net