...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #9  
Old 07-08-2009, 04:43 AM
68RS350 68RS350 is offline
Member
 
Join Date: Jun 2006
Posts: 90
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Then once I had the ends milled it was time to bolt the bellhousing ends to the jigs and put the new longer tube in. After the tube was inserted I welded the bottom the jig together with 1.5"x1.5" sqaure tubing so I could transport it and take it to the weld shop. The ends are parrallel within 1/16".

Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 01:19 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net