View Poll Results: How long has your project taken
1 to 2 years 10 14.29%
2 to 3 years 7 10.00%
3 to 4 years 11 15.71%
More than 4 years 42 60.00%
Voters: 70. You may not vote on this poll

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #5  
Old 07-28-2012, 12:26 PM
Matt@BOS's Avatar
Matt@BOS Matt@BOS is offline
Lateral-g Supporting Vendor
 
Join Date: Oct 2008
Posts: 2,042
Thanks: 2
Thanked 37 Times in 30 Posts
Default

I'd say two years to get it drivable and "done." Add in another six months to get it 95 percent sorted. Then mine got hit, and that took two months to fix. After all the upgrades it took another six months to sort out. Then I got another engine which promptly died. I should be back on the road six months after the engine gave out, at which point I'll be changing springs, tires and master cylinders

Oh, and having a shop that was local to me meant that I never really had to worry about cleaning out the garage. Laziness loves convenience...

So Curtis, when is the car coming home? Before or after Dave is racing?

Matt
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 01:41 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net