It's been a slow month on the build. I ran into scheduling issues with the chassis fab shop. I ended up having to use a different shop in order to keep the project moving. The car is now scheduled to go to Pro Fab Performance next week for the cage work. The car will then go back to Tom Argue for paint work and a few misc. items. I did receive my gauges from SpeedHut. I went with their Legacy Series. I was also able to mock up the center cluster with gauges and switch panel but it still needs to be painted.






Last edited by Neil B; 02-11-2016 at 09:45 AM.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 10:35 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net