We worked on the trans tunnel. I bought the front section of the tunnel from B&B. The rear section Dad and I formed with a piece of 4" steel pipe and a board that Dad shaped for a makeshift hammer form - - - I'm really pleased with how it turned out.
Made one section of the floor panel - - got to play with my Mittler Bros bead roller!
Welds ground and stitch welded into the rocker tubing (my added 3X5" tubing)
Almost looks like I know what I'm doing.
Botom view.
That was about all dad and I could squeeze into the last few days - - --